BTR Personnel services AB jobb

Lediga jobb hos BTR Personnel services AB

Installer

I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

22 april 2024
Sista ansökan:
22 maj 2024
Installer

I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

15 april 2024
Sista ansökan:
15 maj 2024
Site Manager

The Site Manager is responsible for overseeing and managing various aspects of the site. The primary role of this role is to ensure that construction projects are completed safely, efficiently and within budget. The duties and responsibilities of this position include: • Participate in project planning and coordination of activities, including review of project specifications, blueprints, and work schedules. This role works closely with project managers, architects and engineers to understand project requirements and ensure the necessary resources are available. • The Site Manager is responsible for supervising and managing construction teams, including subcontractors and laborers. Assigns tasks, provides guidance and ensures that work is performed in accordance with project plans and quality standards. Daily supervision and monitoring of works so that the equipment is mounted and the installation is carried out in accordance with the rules of the profession. Coordinates employee training and monitors their work performance. • Conduct regular safety inspections, identify potential hazards and take corrective action to prevent accidents and ensure compliance with health and safety regulations. • The Site Manager monitors the quality of construction work and materials to ensure compliance with project specifications and industry standards. Perform regular inspections, collaborate with quality control teams and resolve any issues or deviations from required quality standards. • Monitors resource allocation and works to optimize productivity and efficiency. Monitoring the condition of materials and tools on the project. Preparation of specifications and ordering of equipment and materials. • Identifying and solving problems. Analyzes problems, proposes solutions and collaborates with project teams to implement effective solutions while minimizing delays or disruptions. • The site manager is responsible for ensuring compliance with legal and regulatory requirements related to construction projects, such as building codes, permits and environmental regulations. Works closely with Occupational Safety and Health, Human Resources and Legal to implement relevant regulations on site. Ensures compliance with all regulations and procedures prescribed by the company and is responsible for ensuring that every employee on the construction site complies with company and legal regulations. • Maintains accurate and organized project documentation. Keeps records of project milestones, inspections and any incidents or accidents that occur on site. Coordination and active participation in the preparation of documentation for the handover of the facility. • Identifies areas for improvement and implements best practice. Monitors industry trends, technological advances and construction techniques to improve project efficiency and quality. • Coordinates with project stakeholders, including clients, contractors, and suppliers. • Prepares and submits regular progress reports, including cost tracking, work schedule and overall project status. Conditions: • Diploma of vocational education - technical profession or BSc in technical field • Knowledge of the English language – B1 • Driver's license • At least 3 years of work experience in the position of manager Ability: • Installation troubleshooting • Changes in the project • Alignment with the acquired state of the object • Good communication • Ability to organize work and people • Ability to manage time

9 april 2024
Sista ansökan:
9 maj 2024
Installer

I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

9 april 2024
Sista ansökan:
9 maj 2024
Site Quality Coordinator

Your field of activity - challenging and future-oriented · Project Assessments, 1st party Walkdowns, 2nd party Walkdowns. · Review ITPs · Witness of Hold points. · Contractor Surveillance and Performance Reporting · Verification of change management, including deviations · Approval of subcontractors and review of contractors' data and certification, inspection, and release of purchased components. · Management and reporting of contractor non-conformances and corrective actions · Monitoring the quality of the documentation to ensure that it is following Good Documentation Practice · Acceptance of completed Trade Partner’s Test Pack Preferable qualification · You have graduated in the field of technical, engineering sciense and/or quality control. · You have years of relevant professional experience and good knowledge of project and quality management (possibly on construction sites). · Knowledge of Quality Management Systems · Usable knowlege of quality core tools (PPAP, APQP, FMEA) · Experiance in problem soving tools (8D, A3, Ishikawa, 5 Why) · Your systematic approach is characterised by your ability to analyse and structure. · Working knowledge of standards ISO 9001, ISO 14001, ISO 45001 · As an independent quality expert in our complex projects, management skills are a matter of course for you. · Professional management experience (interdisciplinary). · Experience with customers in international business. · You communicate in English, both written and spoken.

5 april 2024
Sista ansökan:
5 maj 2024
Installer

I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

5 april 2024
Sista ansökan:
5 maj 2024
Installer I class

Installer I class - job description I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter III. Ability • Troubleshooting installation issues • Changes in the project • Alignment with the acquired state of the object Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

3 april 2024
Sista ansökan:
3 maj 2024
Installer Team Leader

Installer Team Leader - job description I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter III. Ability • Troubleshooting installation issues • Changes in the project • Alignment with the acquired state of the object IV. Team management • Manages a team of 3-5 installers • Makes sure the team has the equipment to work • Makes sure that there is enough material to work with • Controls the quality of works • Introduces the new employee to the job • Takes care of safety at work Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height Good communication Ability to organize work and people Ability to manage time The ability to develop and raise the knowledge of employees in the team

3 april 2024
Sista ansökan:
3 maj 2024
Electrical Installation Worker

Electrical Installation Worker is responsibile for the installation of electrical systems, including rack routes, equipment mounting and connection, and electrical cabinet setup. Responsibilities: · Rack Route Placement: Efficiently plan and implement rack routes according to project specifications, ensuring optimal organization and accessibility. · Equipment Mounting and Connection: Safely and securely mount electrical equipment, ensuring proper alignment and connection to power sources and other components. · Electrical Cabinet Connection: Install and connect electrical cabinets, adhering to safety protocols and industry standards. · Reading Electrical and Mechanical Projects: Interpret electrical and mechanical project documents to understand installation requirements, including layout plans, equipment specifications, and technical drawings. · Reading Electrical Schematics: Analyze and comprehend electrical schematics to accurately implement wiring and connection strategies. · Installation of Electrical Lines and Cables: Execute the installation of electrical lines and cables with precision, considering factors such as routing, insulation, and capacity. · Installation of Electrical Equipment and Connection: Install various electrical equipment, such as switches, outlets, and control panels, ensuring proper functioning and connectivity. · Collaboration: Work closely with project managers, engineers, and other team members to coordinate installation activities and resolve any issues that may arise during the process. Requirements: · Proven experience in electrical installation, preferably in a similar role. · Proficiency in reading and interpreting electrical and mechanical project documents, including schematics, layouts, and technical drawings. · Strong understanding of electrical systems and components, including wiring, cables, and equipment. · Familiarity with industry standards and safety regulations related to electrical installations. · Excellent attention to detail and accuracy in executing installation tasks. · Ability to work independently and as part of a team, demonstrating strong communication and collaboration skills. · Physical stamina and dexterity to perform tasks requiring manual labor and working in various environments.

3 april 2024
Sista ansökan:
3 maj 2024
Installer

I. Installation of clean room panels • Scaling positions for placing panels with a laser meter according to the blueprint and plan given by the design team-according to the project (knowledge of reading project drawings). • Placement of guides and U-profiles according to the drawn positions (base for the panel) • Placing the panel: o Smaller panel 3x1.2m weighing up to 75kg o Larger panels up to 12m high - lifting by robotic arm and vacuum The panels are screwed into each other. • Installation of hangers and L-profiles for the ceiling; screws into the panel • Hanging the ceiling, screwing and fixing it to make it as strong as possible • Placing and screwing the holker into the ceiling and floor to close all voids and ensure solidity • Installation of double-glazed windows • Installing the door: o Rolling doors o Slide o Regular • Cutting holes for sockets and switches according to the project • Siliconization of all joints and all elements II. Installation of HVAC systems • Creating channels for air flow o Polyurethane styrofoam pieces are cut according to the blueprint and sorted o Gluing the parts to form a channel o PT3 tape is glued to the cones o The flanges for connecting the ducts are tapped o Siliconization of all joints • The finished channel is placed on the ceiling • Connection of HVAC units • Screwing, installation of sealing tape and siliconization • Each chamber has its own damper/valve to which the channel is attached: o Sponge tape and silicone • Installation of housing and HEPA filter Tool handling: 1. Screwdriver 2. Sander 3. Hammer 4. Parakeets-pincers 5. Burgia 6. Tools for cutting aluminum Operation of machines: 1. Forklift 2. Robotic arm 3. Lifting platform and equipment for working at height Permit to work at height

3 april 2024
Sista ansökan:
3 maj 2024